Location
Portsmouth, Hampshire | United Kingdom
Job description
Along one 3.6 meter wall in the kitchen I would like to have removed 5 standing cabinets, one built in gas oven, one gas hob, and sink. (I will see to the disposal) All of the doors and drawers will be removed prior to work starting. Once removed - I would like the following-: 1. Erect and fit 6 floor standing cabinets, one of which is a tall cupboard that will house the oven. (I will fit cabinet doors and drawers). 2. Install and connect gas cooker. 3. Fit worktop, cut out space for sink and gas hob. 4. Fit and connect gas hob. 5. Fit and connect sink and taps. 6. Electricity and gas points are in situ.
Job tags
Salary