Location
Bhopal | India
Job description
Should have 3-8 years' experience in the construction.
Experience in water supply related projects will be added advantage.
JOB PROFILE:
- Installation and commissioning of field instruments along with SS tubings and calibration.
- Logic development for SCADA along with service provider
- Installation & Alignment of Electrical Panels, MCC and Electrical switchgears(ACB, MCCB, MCB and Contactors)
- Erection, Commissioning and Maintenance of LT and HT Motors for Pumps, MCC Panels, and LCS etc.
- Power Cable laying and Termination in Sub-Station, MCC Panels, Motors, Motorized Valves, and LDBs etc.
- Integration of MCC with PLC Panel, Loop Checking, Commissioning.
- Designing, Troubleshooting and Modification of Breakers and Panels as per Site requirements.
- Testing of Panels, Motors and cables like Megger, Ratio Test, Polarity, Knee-Point, HIPOT etc
- Testing of MCC , PDB, NGR, Metering Panel(HT and LT), DC Panels- Testing activities included
- Project work involves Survey, Foundation, Erection, Stringing, Testing
- Experience in installation of Transformers, substation & pumping application, Project lighting requirements.
- Experience in basic instrumentation & Automation requirements at project.
- Ensure Quality & safety procedures during site execution.
Qualification
4 yrs FULL TIME 1st Class - BE / B. Tech - ELEC from AICTE/UGC approved university or
3 yrs FULL TIME First Class Diploma in Elec Engineering from State Board of Technical Education.
Mandatory 1st class throughout academics (10th & 12th)
Job tags
Salary