Location
Chennai | India
Job description
The Role :
The new SEAM organization integrates Safety, Environment & Asset Management activities, with a broad geographical footprint, that will support Shell’s business & assets around the world.
The vision of SEAM is to provide capability across the spectrum of Safety, Environment and Asset Management with:
- shaping the future ways of working through introducing to the business new technology and news way of working, including e.g., digital, SBO, and real-time, data-driven, end-to-end optimization and risk management, but also global programmes like Human Performance Based Safety Philosophy.
- providing performance feedback driving disciplined execution to deliver reliable, predictable results
- helping the businesses build their improvement plans and provide support to execute them
- sustaining performance through strong core capabilities (internal, including SBO & contingent) through building expertise and a company-wide consistent approach
The VP TAO will be accountable for maximizing integrated business value across the organization. Technical Asset Operations (TAO) is a key enabler for the accelerated delivery of Shell’s Asset Management System and will help us to reach our ultimate potential in Downstream Manufacturing, Integrated Gas and Upstream. TAO provides high quality and cost-competitive technical resources who are not physically present at site yet are an integral part of asset teams delivering value through end-to-end AMS work processes.
The role of Sr. Process Data Engineer in Turnaround Planning is to actively contribute to the development of work packages and execution plans for all disciplines, including project and operational activities which are integrated into a single multi-disciplinary schedule. The overall aim is to maximize the re-use of proven work-packs for recurring or similar activities, and in doing so avoid unnecessary re-work for each event, introducing waste and loss of corporate memory.
The purpose of the Turnaround planning activities is to identify the steps and resources necessary for the safe and efficient execution of maintenance activities according to defined quality standards. A Work Package defines in detail the activities to complete a task, relationships between tasks, identifies all information, materials and services for efficient execution and scheduling for UPS/IS/DSM assets of Shell.
Effective T/A planning offers the reward of a safe, high quality, predictable, repeatable, and effective execution of an Event which will in turn lead to cost competitiveness.
Purpose & Accountabilities
Technical Expertise & Active Contribution :
- Responsible for preparing comprehensive work packs for major maintenance/ Overhauling of heavy-duty rotating equipment like engines, compressors, pumps, turbines etc., Also responsible for preparing E&I Instruments as per requirements.
- Lead Turnaround work scope collection process and significant contributor to the scope challenge and selection process.
- Will be responsible to develop Work packs which shall include but not limited to,
- Shutdown and blowdown sequence (Operations)
- Boundary Isolations
- Equipment isolations (based on the work scope of the T/A)
- Work packs for all mechanical works, electrical and PACO (with inputs from the Maintenance, turnaround, and Projects Engineers)
- Quality Assurance
- TIP (Test Inspect Plan)
- Flange management
- Mechanical Completion Cert
- Punchlist template
- Leak Testing
- Facility walkdown and normalization in prep to start up
- SURU (Start Up Ramp Up)
- Review/approves all request for deviations from Planning Premises document proposed and seeks approval from TA Manager or Event Manager.
- Responsible for Addenda Process implementation after the scope is frozen
- Is mindful of and continues to look for opportunities to reduce turnaround scope, and plan and execute with low-cost mindset.
- LEAN mindset that proposes and implements improvement ideas to both the planning and field execution process to improve performance and reduce cost.
- Coordination with numerous other Shell disciplines - operations, engineering, procurement, finance.
- Demonstrate Process Safety Management.
- Use the TA Planning & Scheduling tools viz. Primavera P6, Roser for efficient TA Planning.
- Create subfolders based on equipment tag per Unit (RDU, RVC, etc.)
- Extract technical data for the scope items out of the following systems: GSAP, AIM, Roser, IN tools, SIFpro, I-Plan.
- If data is exported from Roser/I-Plan to SharePoint, check for revision updates.
- Save the extract data in the right subfolder according to the correct method.
- If find useful information for the next TA in Roser/I-Plan when collecting scope specific data, for example: extradentary scaffolding information, work method statements, etc., collect/ save this data as well in the subfolder.
- Keep track of the progress in a dashboard that monitors progress on FLOCS to be processed.
Ensure compliance :
Ensure
Job tags
Salary