logo

JobNob

Your Career. Our Passion.

PF - Mechanical (LS Crusher)


Ultratech Cement Limited


Location

India | India


Job description

Execution of preventive & corrective maintenance activities. Ensure periodic checking. Manpower planning one day in advance for daily jobs. Proper Job planning for shutdown jobs. Eliminating non value adding activities. Spare parts planning for major shutdown jobs as well as fulfilling day to day basic requirements.

Reduction in plant breakdown- Analysis of major / minor breakdowns and plan corrective actions accordingly. Availability of critical equipment spare parts and raising indent for procurement as per requirement. Plan and installation of critical equipment stand by if possible and under the cost. Execution of preventive maintenance activities as per schedule and equipment site condition.

Shutdown Jobs Performing- Prepare the job list for shutdown as per priority for the plant. Proper Job planning for shutdown jobs. Planning of contractor jobs to be carried out and raise service work order accordingly. Spare parts planning for major shutdown jobs as well as fulfilling day today basis requirements. Planning and procurement of advanced good quality tools and tackles for fast execution of jobs.

COST CONTROL: Plan monitor and control spares and lubricants inventory and manpower cost as per budget in Mech maintenance activities. Reduction in section cost by reducing breakdowns. Reduction in section cost by avoiding idle running of equipment. Avoid over time and optimum utilization of contract manpower. Control the handling cost by avoiding Spillage. Close monitoring on worker's overtime. Identification of maintenance cost reduction parameters.

Focus on SHE (Safety, Health & Environment) along with Sustainability initiatives:
Ensuring 100% compliance of all safety standards and all applicable recommendations related to their concerned area. Timely conducting scheduled SO round and reporting of accidents, incidents and near misses on occurrences in the area of concern in system. To conduct daily Tool Box Talk as schedule and before start the job any critical job along with SWP

System Management (Effective implementation of all IMS and other systems requirements through involvement for continuous improvement in plant working condition & quality standards):To implement improvement project to reduce repetitive problems/breakdown or losses. Timely submission of Kaizen, OPL, Good to fine, suggestion on system.


Job tags



Salary

All rights reserved