Prepare Material requisition list for mobilization of Pipelay barge.
LiaisewiththeInstallationEngineersonshoreonoperational matters during preparatory phase, mobilisation andduringinstallationphase
EnsuretheInstallation Engineer and Installation Manager receives regular status updates on the progress of work. ( every 6 hrs in Offshore)
Ensurethework is planned and executed according procedures, and liaise with the offshore Superintendent on the technicalrequirementsoftheproject.
Shall handle pipelay barge one shift single handedly.
Providetechnicalsupportduring offshore execution and shall always put more effort to perform work in safe and efficient way.
For minor site changes on pipelay barge setting parameter, candidate shall be able to perform offpipe analysis to ensure pipeline stress are withing acceptable range. OR communicate the changes to installation engineering team and perform the changes as required by installation engineering team