Framatome
Location
Montrouge, Hauts de Seine | France
Job description
Installed Base BU is in charge for Framatome's nuclear engineering and services for operating nuclear plants, for new build projects and for installations in decommissioning phase.The Installed base BU has more than 60 years of international experience in all types of technologies on more than 380 reactors worldwide.With 4,600 employees in 15 countries, the Installed Base BU has a strong identity and its vision is to: “Deliver innovative products and services by putting our high-level skills to work to guarantee throughout the world a safe and competitive, low carbon source of energy.”
EDF EPR Engineering UK (EPR-E) is a subsidiary of Edvance, which is a joint venture between EDF and Framatome, established in 2018 in charge of the design and the realisation of nuclear islands for new projects in France and worldwide.
In particular, EDF EPR Engineering UK is responsible for the design and construction of the nuclear island for Hinkley Point C (HPC) project and preparing the design replication and engineering activities for the Sizewell C (SZC) Project.
For the SZC Project, work on the replication strategy and some early design studies are already underway and being delivered and managed from both France and UK.
For the Sizewell C Nuclear Services Agreement (NSA) Project Directorate a position of Cost Controller is open.
The NSA Project Directorate team is leading the Consortium and is responsible for the overall project management of the NSA execution. It is composed of four scopes of work which are responsible for:
On behalf of the NSA Project Directorate team, The Project Control office is responsible for monitoring cost, timely delivery and project execution in accordance and for the measurement of overall performance indicators. It provides to the Project Director global vision of the project to help for decisions.
The Project Control office manages several scopes:
The NSA Cost Controller role is to consolidate the financial data of the Nuclear Services Agreement of the Consortium members.
The responsibilities of the NSA Cost Controller include:
The NSA Cost Controller reports to the NSA Cost Control Manager.
PLEASE NOTE:
Occasional travels to the workplaces of the Consortium members are required: Montrouge (Park Azur and Flow buildings) and/or Tours in France
To be considered, the following qualifications, skills and experience are essential:
Software skills:
Languages (level)
The Consortium composed of EDF SA and Edvance is expected to provide the design of the two nuclear powerplants in the framework of the Nuclear Services Agreement (“NSA”) i.e., the contract that will be signed between the Consortium and the SZC Generation Company (“SZC Co” or the “Client”). The NSA is expected to be signed at the end of the first quarter of 2024.
The Sizewell C (“SZC”) project’s goal is to replicate the Hinkley Point C design to build two EPR reactors on the Sizewell site, located on the East Coast of England. The British Government aims at renewing the existing nuclear fleet to achieve its Net Zero objectives by 2050.
SZC will supply power to 6 million homes and will save 9 million tons of CO2 emissions for every year of operation. When operating, SZC will employ 900 people, in addition to the thousands of jobs needed for maintenance outages.
SZC provides the UK with a unique opportunity to develop a nuclear new build which is the ‘second of a kind’ and will demonstrate significant cost and risk savings from such an approach.
At EDF we’re dedicated to offering flexible benefits that support our people across all aspects of their lives. We’re delighted to offer a range of benefits to support our employees’ physical, emotional and financial wellbeing.
In addition to a competitive salary, we offer a market-leading company pension scheme, paid holidays and a range of flexible benefits, such as: a company incentive bonus plan, health cover, cycle to work scheme, discounts and employee pricing.
Please let us know if you’d like to discuss flexible working arrangements by highlighting this on your application.
Why EDF?
When it comes to saving theplanet,everyone’s talking the talk these days. As Britain’s biggest generator of zero carbon electricity, we’re not just talking about it, we’re doing something about it.
At EDF every single one of us is 100% committed to reducing the UK’s carbon emissions to Net Zero.
We’re generating the right mix of low carbon electricity to power the nation today and building the low carbon infrastructure Britain will need tomorrow.
Our people form a 10,000+ strong community, rich in diverse backgrounds and perspectives. We empower our people with the skills they need to build a successful career and to bring our purpose to life in their work.
Join us and together we can help Britain achieve Net Zero.
United Kingdom
25%
Standard
Master
Experienced
Yes
Yes
Job tags
Salary